This scheme is based on the user's use of raw materials (small path wood, branches) as raw materials,It can be adjusted appropriately according to the raw material conditions of the user's farm.
Public works; Substation, water, making colloid, our company provide relevant technical parameters;
Code | Machine name | Unit | Qty | MajorTechnical Parameters |
PY-80 | Belt conveyor | SET | 2 | Power: 4kw W=800mm L=15000mm |
KT-2 | bale opener | SET | 2 | Power: 30kw |
IT03 | Magnet | SET | 2 | 500×300×100mm |
Hammer mill | SET | 3 | production capacity: 8-10 t/h import: 1.6m, feed belt: 1.6m, long 6.0 trough type,motor:7.5*2, main motor:280kw oil pump 1.1kw, electric cabinet 1set, | |
Underground bin | SET | 1 | Power:6kw | |
LX-80 | Belt conveyor | SET | 2 | Power:3kw W=800mm L=16000mm |
Pulp Tore solve machine | SET | 2 | Power:90kw | |
Removal of stone sand system(air separation system) | SET | 1 | Power:5.5kw+5.5kw | |
BZY1150 | Belt conveyor | SET | 2 | Power:3kw W=800mm |
According to the actual situation on site and user requirements, the process equipment shall adjust its price accordingly.
Date of delivery : In the case of the buyer with the necessary conditions and vigorously cooperate, The first batch of equipment shall be delivered within 130 days after the contract becomes effective.
Complete equipment delivery in 200 days
240 days full line load test
Liaoning JinRong Machinery Import and Export Co., Ltd is a company with its own import and export rights, and is a large group company integrating industry and trade. The registered capital of the company is RMB 180 million. The company includes metallurgical equipment manufacturing company, electric furnace equipment manufacturing company, electrical equipment manufacturing branch, mechanical processing branch and metallurgical design and research Institute.
Total Number of Staffs | 585 | ||
Total Number of Managers | 40 | ||
Total Number of Technical Staffs | 160 | ||
Total Number of QC Staffs | 15 | ||
Total Number of workers | 310 | ||
Total Number of other staffs | 60 | ||
Contact person | Mr .Su | Position | President |
|
Suppliers with verified business licenses